EN FR
Image de fond

Jean Monnet

Jean Monnet schoolyards

Client → Municipality of Evron

Brief → Project management: studies, site supervision and running educational and co-design workshops with pupils.

Team → Atelier Soil (leader), Urbanwater (Roads and utilities, hydrology)

Surface area → 3,300 m² 

Date → 2024 -2025

Location → Evron (53)

Design and construction of two Oasis play areas for the Jean Monnet school complex in Evron.

Co-design workshops with the school’s pupils and teaching staff

 

© Antoine Seguin

Right from the start of the project, the pupils and staff at the school – who are the ones most directly affected – were actively involved in the planning process through participatory workshops. The aim was to share perspectives on the existing situation, consider the uses we would like to develop, understand the implications of the various development options, and thus arrive at a joint project endorsed by everyone.

1. Mapping the existing situation: Diagnostic Workshop
2. Envisioning possibilities: Design Workshop
3. Understanding the impact of development choices: Scientific Surveys Workshop
4. Taking ownership of the new courtyards: Feedback and Planting Workshop

Balancing simplicity and performance by maximising the benefits of each feature:

1. L'école buissonnière
2. L'îlot de biodiversité
3. Le jardin en mouvement
4. La plaine des sports
5. L'oasis 
6. L'îlot des jeux
7. L'îlot des sens